BHR Construction Co.
BHR Construction Co.
Government and Public Works Construction
BHR Construction · Government and Public Works Construction

Government and Public Works Construction
If you can dream it, we can build it.

Bondable, USMC-veteran-led general contractor for public-sector construction across the Southeast. Federal civilian, military base support, state DOT facility work, county and municipal capital projects, K-12 school district modernization, and higher-ed buildouts. NASCLA Unlimited Building GC plus $1M+ government bonding capacity — credentials a public agency can verify in minutes.

Government and Public Works Construction · Travelers Rest, SC

Why government and public works construction works the way it does in Travelers Rest

About Travelers Rest, SC. Travelers Rest sits at the foot of the Blue Ridge Escarpment north of Greenville, where the Swamp Rabbit Trail terminates and the terrain begins climbing toward Caesars Head and Table Rock. The town has shifted in the last decade from a sleepy crossroads into a destination market for outdoor-oriented buyers, retirees, and Greenville professionals who want acreage and mountain views within a 20-minute commute.

What it means for government and public works construction. Build sites here transition fast from flat bottomland to steep, rocky foothill slopes, which means foundation cost — pier-and-grade-beam, deep footings, retaining walls — varies enormously parcel to parcel. Many Travelers Rest projects are private-road or shared-driveway sites with septic, well, and slope-stabilization considerations the buyer didn't see coming. Common work: custom homes on view lots, screen-porch and outdoor-kitchen additions oriented toward the ridges, and full remodels of older Cleveland Highway-area homes.

Areas we build government and public works construction in

The Cliffs at Mountain ParkThe Cliffs ValleyCherokee ValleyNorthcliffPoinsett ReserveDowntown TR / Main StreetTigerville Road corridor
Government and Public Works Construction
Government and Public Works Construction

What We Do

    Transparent Pricing

    What Affects the Price

    Every job is different. Here's what we look at when we put together your estimate — so there are no surprises on job day.

    1

    Procurement type — IFB low-bid, RFP best-value, IDIQ task order, or sole-source

    2

    Bonding requirement — bid, performance, and payment bonds at full contract value

    3

    Davis-Bacon prevailing-wage requirements and reporting coordination

    4

    DBE / MBE / WBE / VOSB participation goals and tier coordination

    5

    Specialty scope — secure facility, MEP redundancy, ADA upgrade, hazmat abatement

    6

    Phasing for occupied facilities (schools in session, courts in session, hospitals)

    We don't quote over the phone. Every estimate is done on-site because that's the only way to give you a number you can count on. No ballparks, no surprises.

    Our Process

    How We Approach
    Government and Public Works Construction

    01
    Step 01

    Solicitation Review & Bid Strategy

    We review the IFB, RFP, or RFQ with the same discipline a federal contracting officer reads it. Bid bond, performance bond, payment bond, Davis-Bacon prevailing wage, SAM.gov registration, DBE participation goals — every requirement walked through before we no-bid or commit. Veteran-led, NASCLA Unlimited Building GC, $1M+ surety capacity standing.

    02
    Step 02

    Pre-Con, Compliance & Mobilization

    Public-sector pre-con is documentation by default — submittals, schedule of values, EEO, OSHA site safety plan, and the inspection cycle stitched in. We mobilize on the contract date, not three weeks late. Same operational discipline that earned our 7 Brew national approval.

    03
    Step 03

    Build, Inspect, Close Out Clean

    Public projects close out on the documentation as much as the work. As-builts, O&M manuals, warranty letters, lien releases, prevailing-wage documentation, and punch list to zero — assembled the way a contracting officer expects so retainage releases on time and your next bid evaluation rates us 'responsible' the day we walk off site.

    Common Questions

    Government and Public Works Construction FAQ

    Outcomes

    What success looks like for government and public works construction in Travelers Rest

    Ready to Start?

    Get Your Free
    Government and Public Works Construction Estimate

    Free design and feasibility consult. We listen first, scope honestly, and give you a real number after we see the lot — not a phone ballpark.

    NASCLA Unlimited GC
    Licensed · Bonded · Insured
    Marine Veteran-Founded
    Approved 7 Brew National Contractor

    Get Your Free Estimate

    Ready to Start
    Your Project?

    Three minutes through the estimator gets you a ballpark range, a calendar slot, and a real reply. Same or next business day, free design and feasibility consult — no pressure, no SaaS chatbot, just Ben or someone from his team picking up the phone.

    • Free design & feasibility consult
    • Same or next business day response
    • NASCLA Unlimited Building GC · Licensed · Bonded · Insured
    • Marine veteran-founded · 101 N Main St, Greenville SC

    Start The Estimator

    A few questions. A real number. A calendar slot.

    The estimator on our home page asks a handful of project questions, returns a low/high range, and lets you book the consult — all in about three minutes.

    Start My Free Estimate
    or call directly
    866-658-8017

    We respond same or next business day. By tapping above you agree to BHR's privacy policy.

    Click any element on the page