BHR Construction Co.
BHR Construction Co.
Metal Building Construction
BHR Construction · Metal Building Construction

Metal Building Construction
If you can dream it, we can build it.

Metal buildings are what we build most. Private shops and detached garages on residential acreage, hobby and equipment-storage buildings, working agricultural barns — and on the commercial side, contractor yards, light-industrial shops, distribution warehouses, and supplier facilities. Sized to your use case: 40×100, 49×90, 50×150, 60×100, 60×300, and up. Foundation to finished interior, one GC, no hand-off seams.

Metal Building Construction · Easley, SC

Why metal building construction works the way it does in Easley

About Easley, SC. Easley is technically in Pickens County but functionally part of the Greenville commuter shed, sitting just west of the city along US-123 toward Clemson. It's a value-conscious market with strong public schools, a mix of mid-century and 90s-era subdivisions, and a steady flow of new construction on former farmland to the south and east.

What it means for metal building construction. Pickens County permitting and inspection rules apply here, not Greenville County, which is a frequent source of confusion for relocating buyers comparing lots. Soils on the Easley side trend toward red clay over saprolite, with reasonable drainage on most parcels but expansive behavior in pockets — basement and crawlspace decisions should follow a real soils evaluation. Typical work is new custom homes on 1–5 acre tracts, kitchen and primary-suite additions to 80s/90s ranches, and the occasional barndominium-style build on family land.

Areas we build metal building construction in

SmithfieldsBrushy CreekFox RunRolling Green Village (adjacent)Saluda River areaDowntown Easley
Metal Building Construction
Metal Building Construction

What We Do

    Transparent Pricing

    What Affects the Price

    Every job is different. Here's what we look at when we put together your estimate — so there are no surprises on job day.

    1

    Building footprint and eave height (clear height drives column and frame steel)

    2

    Roof and wall insulation R-value, vapor barriers, liner panels

    3

    Door package — overhead/roll-up count, walk doors, dock equipment

    4

    Slab thickness, rebar, PT, frost depth, and any moisture barrier

    5

    Interior build-out — offices, bath, mezzanine, conditioned space, shop layout

    6

    Site access, grading, drainage, and any utility extension to the pad

    We don't quote over the phone. Every estimate is done on-site because that's the only way to give you a number you can count on. No ballparks, no surprises.

    Our Process

    How We Approach
    Metal Building Construction

    01
    Step 01

    Sizing, Use Case & Pad Engineering

    Length, width, and eave height get sized off how you'll actually use it — tractor and equipment turning radius for a private shop, lift heights for a contractor yard, dock vs. drive-through for distribution, mezzanine for a hobby loft. Pad, slab thickness, and frost-depth footings engineered to your soils — not a default detail.

    02
    Step 02

    Red-Iron Frame, Sheeting & Trim

    Pre-engineered primary frames, secondary purlins and girts, R-panel or PBR sheeting with closures, and trim packages (rake, eave, base, corner) installed to the manufacturer's standard so the warranty stands. Insulation, liner panels, vapor barriers — specified up front against your climate and use case.

    03
    Step 03

    Doors, MEP & Finished Interior Build-Out

    Roll-up, sectional, and walk doors framed and flashed properly. Electrical, plumbing, and HVAC roughed and trimmed against your end use — workshop lighting, climate-controlled storage room, full office, bathroom, mezzanine. Same crew runs the shell and the finish — no separate GC, no warranty finger-pointing on the hand-off.

    Common Questions

    Metal Building Construction FAQ

    Outcomes

    What success looks like for metal building construction in Easley

    Ready to Start?

    Get Your Free
    Metal Building Construction Estimate

    Free design and feasibility consult. We listen first, scope honestly, and give you a real number after we see the lot — not a phone ballpark.

    NASCLA Unlimited GC
    Licensed · Bonded · Insured
    Marine Veteran-Founded
    Approved 7 Brew National Contractor

    Get Your Free Estimate

    Ready to Start
    Your Project?

    Three minutes through the estimator gets you a ballpark range, a calendar slot, and a real reply. Same or next business day, free design and feasibility consult — no pressure, no SaaS chatbot, just Ben or someone from his team picking up the phone.

    • Free design & feasibility consult
    • Same or next business day response
    • NASCLA Unlimited Building GC · Licensed · Bonded · Insured
    • Marine veteran-founded · 101 N Main St, Greenville SC

    Start The Estimator

    A few questions. A real number. A calendar slot.

    The estimator on our home page asks a handful of project questions, returns a low/high range, and lets you book the consult — all in about three minutes.

    Start My Free Estimate
    or call directly
    866-658-8017

    We respond same or next business day. By tapping above you agree to BHR's privacy policy.

    Click any element on the page